Onshore
Offshore
Pipeline - Compressor and Pumping Station
Pipeline - Valve, Metering, Custody Transfer Station
Pipeline - Main Control Centere, Sub-Control Center
Pipeline - Infrastructure
LNG - Production
E-LNG - Electric drive solutions
E-LNG - Compressors
E-LNG - Power generation
LNG - Terminals
Terminal Management and Automation
Refinery
Olefins
GTL / CTL
Utilities
Power Generation Island
Test-Bed Facility


 

Pipeline - Compressor Station

The Yamal pipeline supplies substantial amounts of natural gas from the West Siberian Basin to Central Europe.

Siemens scope of supply:
more than 20 extremely rugged, field-proven SGT-600 gas turbines.
     
     
 

Pipeline - Compressor Station

A Wingas compressor station boosting European east/west natural gas transport capacities.

Siemens scope of supply:
compressor trains powered by innovative SGT-700 gas turbines;
control systems;
automation and integration up to enterprise resource planning (ERP) level.
     
     
 

Pipeline - Pumping Station

Providing a main-line oil pump capacity of more than 1,700 cubic meters per hour, six of these Sonatrach-operated pumping stations keep crude oil flowing through the 840-km pipeline from Haoud El Kamra to Arzew, Algeria.

Siemens scope of supply:
a total of 30 SGT-200 gas turbines;
system integration; SCADA system;
SINAUT remote terminal units along the pipeline;
fiber optic transmission system;
fiber optic cable;
uninterruptable power supply;
passive cooling shelters;
cathodic protection monitoring.
     
     
 

Pipeline - Compressor Station

Operated by Gasversorgung Süddeutschland, the Blankenloch compressor station was among the first to employ a sophisticated VSDS-driven dry-dry compression solution.

Siemens scope of supply:
5.2-MW VSDS electric motor driver;
STC SV 08-3-A compressor;
active magnetic bearing system;
dry gas seals.
     
     
 

Pipeline - Compressor Station

TCPL Additional Gas, Trans Canada Pipelines.

Siemens scope of supply:
6 variable peed rive ystems (3,100 to 5,040 rpm, 30.6 MW);
brushless synchronous motor;
thyristor converter;
transformer 36.4 MVA;
harmonic filter circuits;
cooling systems for motor and converter;
gas compressors;
lube oil system;
MV switchgear 13.8 kV;
station control units;
harmonic and load flow study;
rotor dynamic study.
     
     
   

Related Links

Valve, Metering, Custody Transfer Station
Main Control Centere, Sub-Control Center
Infrastructure

 
 

 © Siemens AG 2008 - Oil & Gas
Corporate Information / Privacy Policy / Terms of Use / Digital ID