System
Description
The air
cargo
handling
system is
housed in a
single
leveled
steel
structure
building
with
multi-level
office
floors at
landside.
The Terminal
is approx.
270 m long
and 130 m
wide with an
overall foot
print of
35,000 sqm.
Designed for
a an annual
capacity of
500,000 tons
on this
project
stage,
upgradeable
to 1,000,000
tons
annually
with further
extension.
Benchmarking Criteria
- Long term
customer
relationship.
- Short
construction
and erection
time of only
1 year.
- Local
presence for
technical
support and
maintenance.
-
Competitive
pricing.
Customer
Benefit
- High
throughput
capacity
with compact
layout.
- Efficient
IT-Management
system
allowing
short
handling
times.
- Approved
technology
with
reliable
equipment.
- Overhead
monorail
system to
handle bulk
between
Workstations
and
automated bulk storage system, reducing fork lifter transit.